In order to solve the energy supply imbalance in park enterprises, reduce production costs, at the same time in order to cooperate with atmospheric pollution prevention and control work, resolutely defend "LinShu blue", overall planning, decisive ShiCe LinShu economic development zone, adhere to the "high starting point positioning, high standard planning, building high quality", to promote the steam pipe network construction within their respective jurisdictions.
It is understood that in 2016, the economic development zone steam pipe network construction project has been launched, plans to invest 8.9 million yuan, laying 7.2 kilometers of pipe network, to ensure normal operation in June. Up to now, the three sections of the steam pipe network construction in the economic development zone are under intensive and orderly construction. The bridge is under construction from the north to the south of the imperial group courtyard wall.(2) south of xingdajie, oxleg ditch bridge to the county chemical plant is under construction, support pillars have been completed.(3) a total of 334 meters east of Haiyou ruida courtyard wall, a total of 53 dunzi dug, 49 of them have been hit cushion.(Ken peng)